The first project approved by Hong Kong Buildings Authority that utilized typical floor flat slabs as part of the main lateral wind force resisting system. The tower is one of the earliest buildings with transfer plates modeled and designed as a single structure using the then newly released ETABS version with the capability to idealize concrete shell elements in the modeling of transfer plate.
Architect
Chung Wah Nan Architects Ltd
Owner
Yats Developments Limited